Hydrogen Hits the Roads

Audi presents e-gas production facility to power new models in 2013

Published on: December 18, 2012

Audi presented the world’s first industrial plant for generating synthetic methane from CO2 and renewable electricity that is under construction in Werlte. It will produce gas that can be fed into the natural-gas network. 

The Werlte facility will generate enough CO2-neutral e-gas to power 1,500 new Audi A3 Sportback TCNG vehicles 15,000 km (9,320 miles) every year, arriving at dealerships in late 2013. Audi plans to launch a second TCNG model, based on the A4, in 2015.
The Werlte facility will generate enough CO2-neutral e-gas to power 1,500 new Audi A3 Sportback TCNG vehicles 15,000 km (9,320 miles) every year. This compact five-door car will arrive at dealerships in late 2013. Audi plans to launch a second TCNG model, based on the A4, in 2015. The e-gas production will begin in early 2013 and feeding into the public natural-gas network in summer 2013.

The e-gas production will begin in early 2013 and feeding into the public natural-gas network in summer 2013.This power-to-gas technology opens up new possibilities for sustainable mobility and tomorrow’s energy industry. The Audi e-gas plant, which can convert six megawatts of input power, will utilize renewable electricity for electrolysis. This process splits water molecules into oxygen and hydrogen, or Audi e-hydrogen, which could one day power fuel-cell vehicles. As there is not yet a widespread hydrogen infrastructure, however, the hydrogen is then reacted with CO2 in a methanation unit to generate renewable synthetic methane, or Audi e-gas. Chemically speaking, this e-gas is nearly identical to fossil-based natural gas. As such, it can be distributed to CNG stations via the natural gas network and will power vehicles starting in 2013.The CO2 used in Audi’s e-gas plant is a waste product from a nearby biogas plant, operated by energy provider EWE. The CO2, which would otherwise pollute the atmosphere, is chemically bonded into the fuel at the Audi e-gas plant – making Audi e-gas climate-neutral. The e-gas plant will annually produce about 1,000 metric tons (1,102 US tons) of e-gas and will chemically bind some 2,800 metric tons (3,086 US tons) of CO2. This corresponds to the amount of CO©ü that 224,000 beech trees absorb in a year.

Further Reading »

Opening of the Innovation zone of the Hynor Lillestrøm station

Today marked an important step for hydrogen development in Norway, when the Innovation Zone of Hynor Lillestrøm was formally opened. The station has been open for almost a year at Akershus Energy Park and has serviced a number of FCEV´s[1] during that time. The Innovation Zone is a part of the station where innovative new hydrogen technologies will be tested and demonstrated, in conjunction with the operation of the station.

H2 USA follows H2Mobility hydrogen infrastructure initiatives in Europe

Following the national H2Mobility initiatives that have been started across Europe in Germany, UK, France, Scandinavia, the Netherlands, Switzerland and Portugal.

Fuel cell forklift trucks can be cheaper than conventional battery systems

A report of the U.S. Department of Energy indicates, that in warehouses operating for two or three shifts a day, hydrogen-powered forklift trucks can be used at a lower cost than conventional battery-powered material handling equipment.

Enter your email to receive a new password

Email:

Enter your email to unsubscribe from our newsletters

Email: