Drive to next station »

HyNor Porsgrunn

Location: Porsgrunn, Norway
Opening date: June, 2007
Pressure: 700 bar

Rotherham Wind Hydrogen Station

Location: Catcliffe, United Kingdom
Opening date: September 2015
Pressure: 350 and 700 bar

HYPE / Pont de l’Alma

Location: Paris, France
Opening date:
Pressure: 700 bar

Multienergy station Bolzano

Location: Bolzano, Italy
Opening date: 2015
Pressure: 350 bar

Holstebro - Non-Road DK

Location: Holstebro, Denmark
Opening date: June, 2011
Pressure: 700 bar

TOTAL Heerstraße 37

Location: Berlin, Germany
Opening date: 2012
Pressure: 700 bar

Hyop Gaustad

Location: Oslo, Norway
Opening date: November, 2011
Pressure: 700 bar

Air Liquide Hydrogen Refueling Station

Location: Rhoon, The Netherlands
Opening date: 2016
Pressure: 70MPa

Holstebro Refueling Station

Location: Holstebro, Denmark
Opening date:
Pressure: 70MPa

At the InnoGrid2020+ conference,  European Commission Vice-President for Energy Union Maroš Šefčovič  highlighted that €3 billion of EU funding has been  made available for energy network infrastructure and research in the period 2014-2020, thanks to the Connecting Europe Facility (CEF) and Horizon 2020 programmes. Discussions in opening panels pressed sensitive buttons calling for acceleration of  digital network operating. The CEF program seeks to connect all critical infrastructures as intermittent renewable energy is connected to electric and autonomous transport. Hydrogen was not part of the discussion on the first day as the Renault Nissan Alliance was invited as new kid “on the net”. Digital Hydrogen Network operations has not yet been in the picture yet although the EHA in its monitoring of first stations still sees a variety in payment methods and the first offerings of HRS apps.

(Photo: courtesy DG Energy)